ARP rambult 2.7L bi-turbo V6
search
  • ARP rambult 2.7L bi-turbo V6

ARP rambult 2.7L bi-turbo V6

4 250,00 kr
Inkl. moms

Passar alla Audi med 2.7L bi-turbo V6

Dessa ska dras med ARP fett 136nm

Kvantitet

  Security policy

(edit with the Customer Reassurance module)

  Delivery policy

(edit with the Customer Reassurance module)

  Return policy

(edit with the Customer Reassurance module)

Leverans tid ca 2-10 dagar.

Monterings anvisning

 

INSTALLATION METHOD FOR MAIN STUD KITS
Part Number: 204-5801 Application: VW/Audi 2.7L Bi-Turbo V6
1. To ensure proper thread engagement and accurate torque readings, clean ALL threads in the block. Chase the
threads if necessary with ARP Thread Chaser, part number 912-0005 M11 X 1.5).
2. Clean and inspect all hardware prior to installation. Look for obvious defects or shipping damages, plus proper fit,
length and dimension.
3. Screw the studs into the block “HAND TIGHT ONLY”. Inner studs are 3.875 in. long and the outer studs are 3.575
in. long. NOTE: LOCTITE MAY BE USED IF A PERMANENT MOUNTING OF THE STUDS IS PREFERRED.
THE FASTENERS, HOWEVER, MUST BE TORQUED PRIOR TO THE LOCTITE SETTING UP.
4. Install the main caps and check for binding or misalignment.
5. Lubricate the stud threads and nuts with ARP ULTRA-TORQUE FASTENER ASSEMBLY LUBRICANT. Then
install the nuts onto the studs and tighten them hand tight. ARP recommends using the ARP ULTRA-TORQUE
FASTENER ASSEMBLY LUBRICANT that is provided with each kit as opposed to motor oil. This is due to
higher friction on the studs as well as inconsistencies in the clamping force of the fasteners when motor
oil or other low quality lubricants are used.
PRELOAD (TORQUE) RECOMMENDATIONS
6. Following the manufacturers recommended torque sequence tighten the nuts in three equal steps to the
following specifications with ARP ULTRA-TORQUE FASTENER ASSEMBLY LUBRICANT.
11mm studs (1-20) 100 ft lbs M8 Side bolts (17-20) 20 ft lbs
FOOTNOTE: When changing from factory fasteners to high strength fasteners, clamping force and tolerances will
change, therefore it will be necessary to check the main bearing bores for proper size and out of round condition after
installation of the studs and align hone the cylinder block if necessary. The main bores should always be align honed
using the same fasteners and lubricant which will be installed during final engine assembly at the recommended preload.

204-5801